ODM House Street Light Factory – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Sincerity, Innovation, Rigorousness, and Efficiency" could be the persistent conception of our organization for your long-term to establish alongside one another with shoppers for mutual reciprocity and mutual benefit for Led Outdoor Light , Led Motion Flood Light , Dimmable Led Flood Lights , We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
ODM House Street Light Factory – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING Detail:

Product Description

Led Street (4)
products
products
products
products

Product Code

BTLED-1802

Material

Diecasting aluminum

Wattage

A: 60W-120W

B: 20W-60W

C: 10W-40W

LED chip brand

LUMILEDS/CREE/Bridgelux

Driver Brand

MW、PHILIPS、INVENTRONICS、MOSO

Power Factor

>0.95

Voltage Range

90V-305V

Surge Protection

10KV/20KV

Working temprature

-40~60℃

IP rating

IP66

IK rating

≥IK08

Insulation Class

Class I / II

CCT

3000-6500K

Lifetime

50000 hours

Photocell base

with

Packing Size

A: 720x310x170mm

B: 600x290x170mm

C: 400x255x165mm

Installation Spigot

76/60/50mm

Led Street (1)

FAQ

Q1. What about the lead time?

A: Sample needs 5-7 days, mass production time needs 15-20 days for order quantity more than.

Q2. Can I have a sample order for led light?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q3. What about Payment?

A: Bank Transfer (TT), Paypal, Western Union, Trade assurance; 30% the amount should be paid before producing, the balance 70% of the payment should be paid before shipping.

Q4. How to proceed an order for led light?

A: Firstly let us know your requirements or application. Secondly we quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly we arrange the production and delivery.

Q5. Is it OK to print my logo on led light product?

A: Yes, it is available to print yout logo on the led light housing.

Q6. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.


Product detail pictures:

ODM House Street Light Factory –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

ODM House Street Light Factory –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

ODM House Street Light Factory –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

ODM House Street Light Factory –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures

ODM House Street Light Factory –  New design Road Project Lighting Led Street Light Outdoor  – BETTER LIGHTING detail pictures


Related Product Guide:

Good quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is regularly observed and pursued by our company for ODM House Street Light Factory – New design Road Project Lighting Led Street Light Outdoor – BETTER LIGHTING , The product will supply to all over the world, such as: Karachi, Lithuania, Greece, With the development of the society and economy, our company will continue the "loyalty, dedication, efficiency, innovation" spirit of enterprise, and we will always adhere to the management idea of "would rather lose gold, do not lose customers heart". We will serve the domestic and foreign businessmen with sincere dedication, and let us create bright future together with you!
  • Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Sandra from Canberra - 2017.09.09 10:18
    It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Dominic from Bangalore - 2017.10.27 12:12
    Write your message here and send it to us